Friday, May 11, 2012

Friday Projects


We are busy North of Minot working on a residential development for a developer. This week we are excavating for roads that we will be putting in.

Dave in excavator loading Jim in the off-road dump truck

The project engineer steps in the excavator to give it a whirl


 Another project that is ongoing is a new storage yard for Dakota Fence. We have had 10 trucks hauling gravel onto the site this week.




Happy Weekend!

Thursday, May 10, 2012

Building a Road of Scoria


Here are a few photos of what Dustin is up to today with the grader. 




If you have driven around southwestern North Dakota, you will be familiar with the striking sight of the red roads contrasting against the blue North Dakota sky. 

The rock that makes up these red roads is known as scoria, which is sandstone, clay, or shale baked by burning lignite coal.

Bluestone Construction is building some roads in the area for oil sites.

*An exclusive view from inside the grader*


Tuesday, May 8, 2012

Water Tower Project

Another great project is underway today East of Minot.

A Bluestone excavator and bulldozer are onsite today kicking things of for the pad of a new water tower that will be going up this year.

Saturday, April 21, 2012

In the News

Bluestone Construction makes the news!

New Excavator: Volvo 340D

It just wouldn't be right not to introduce the shining new member of the Bluestone fleet. Folks, meet the brand new Volvo 340D. 

Fresh off the trailer onto the muddy job site!

Loading clay into our truck.


The excavator will not replace any of our other excavators, but will instead be used for larger projects. We will be putting it to good use this year!

Friday, April 20, 2012

Crawlspace Footings


One of our projects this week took us to the flood zone of Minot, where Minot's own Jim Olson (KXMC News legend) is rebuilding. His home was condemned after the flood took it's toll on the foundation, and was subsequently torn down. It left the Olsons with a hole in the ground.

Nobody wants a hole in the ground.

The foundation was filled in and compacted to the correct density in preparation for a crawlspace that will support the Olson's new home.

Leif points out something substantial.
Looking good!

Discussing a topic of great depth.

As of Friday, concrete has been poured for footings and forms stripped; next week will bring on the crawlspace walls and backfilling. 

Thursday, April 12, 2012

Spring Septic Systems

Here are some photos of one of our projects going on this week. We are installing a pressure mound septic system by Lake Audobon.

A local farmer was kind enough to provide us with some dirt.

The mound.

Other projects this week include site work for a large storage condo building going up in North Minot.